Description
The
overhead crane is a core lifting device in drilling and well workover
operations. Installed on top of the derrick, it is responsible for suspending
and lifting heavy objects such as drill strings and casing. It employs a
high-strength steel structure and precision pulley system design, featuring
stable load capacity, strong fatigue resistance, and adaptability to harsh
working conditions.
Features
& Benefits
Load Capacity: Classified by rated load, common specifications include 150 tons, 300 tons, 500 tons, and 1000 tons, suitable for oil and gas well drilling operations at different depths.
Materials and Manufacturing Process: Side plates are mostly made of high-strength alloy steel through welding or forging. The pulley surface undergoes wear-resistant treatment (such as carburizing or hard alloy spraying) to withstand long-term friction from the wire rope.
Safety
Requirements: Must comply with API Spec 8C (Oil Drilling Rig and Workover Rig
Specification), possessing impact and fatigue resistance, and must be equipped
with overload protection devices.
Technical Parameter
Model
TC30
TC50
TC90
TC135
TC170
TC225
TC315
TC450
TC585
TC675
Max. Hook load(KN)
300
500
900
1350
1700
2250
3150
4500
5850
6750
Number of Sheaves
4
5
5
5
6
6
7
7
7
8
OD of Sheaves
475
610
762
1005
1005
1120
1270
1524
1524
1524
Dia. Of Steelwire(mm)
24
24
26
29
29
32
35
38
38
45
Mobile:+86 18710316881
Tel:+86 029 89240853
Email:sales@boban-oiltools.com
Add:No. 1511, Block C, Haibo Guangchang, Fengcheng 9th. Road, Weiyang District, Xi'an, China
We chat